Suncorp Premium Lounge Upgrade - Openbare Project Locatie
-
28th februari 2023, DEFECTS TO SUITES NORTH & SOUTH
Hi All,
Please be advised, Intrec has locked all of the Northern Suites and will proceed to do the same for the Southern Suites. Entry is now strictly only via Tom Crossley as he has the key for access and will be driving the final completion of defect.
Any issues please call me direct.
Josh Preston 0449802743
Intrec
Huidige weersomstandigheden op locatie
Laatst bijgewerkt om: 22:21
Temperatuur: 23C (App 24C)
Windsnelheid: 9KM/U
Max. Wind: 20KM/U @12:21
Regen sinds 9:00 uur: 0,0mm
Min.temp: 20C @06:49
Max.temp: 29C @14:38
Windvlaag: 11KM/U
Max. windvlaag: 28KM/U @13:21
Waarneming Locatie - Brisbane, QUEENSLAND
Tijdzone - Oost-Australische standaardtijd
Weerbericht - zaterdag, 4 april
Shower or two.
Min.: 19C Max.: 29C
Kans op neerslag: 50%
Verwachte regen: 0 tot 1mm
Weerbericht locatie - Brisbane, QUEENSLAND
Tijdzone - Oost-Australische standaardtijd
Morgen - zondag, 5 april
Partly cloudy.
Min.: 18C Max.: 28C
Kans op neerslag: 30%
Verwachte regen: 0 tot 1mm
-
VIC Industry Standard - Safe Erection Structural Steel Buildings May 2009
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Safe Concrete Cutting and Drilling JUN 2017
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Precast and Tiltup Concrete for Buildings APR 2001
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Piling Work and Foundation Engineering Sites JAN 2014
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Electrical Installations on Construction Sites JAN 2011
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Contaminated Construction Sites JUN 2017
9-9-2025 Geüpload
save_alt Downloaden -
VIC COP - Prevention of Falls in Housing Construction DEC 2019
9-9-2025 Geüpload
save_alt Downloaden -
VIC COP - Prevention of Falls in General Construction DEC 2019
9-9-2025 Geüpload
save_alt Downloaden -
VIC COP - Managing Exposure Crystalline Silica Engineered Stone NOV 2022
9-9-2025 Geüpload
save_alt Downloaden -
QLD COP - Managing the Risks of Plant in the Workplace FEB 2021
9-9-2025 Geüpload
save_alt Downloaden -
QLD COP - Managing Respirable Crystalline Silica Dust Exposure in Construction and Manufacturing of Construction Elements 2022
9-9-2025 Geüpload
save_alt Downloaden -
QLD COP - How to Manage Control Asbestos in the Workplace FEB 2021
9-9-2025 Geüpload
save_alt Downloaden -
NSW COP - Managing the Work Environment and Facilities AUG 2019
9-9-2025 Geüpload
save_alt Downloaden -
1.11 Issue Resolution Flow Chart Rev 1 - ADOPT SHOULD BE DISPLAYED ONSITE
7-2-2022 Geüpload
save_alt Downloaden
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.