Inner Northern Busway Enhancement - Sitio de proyecto público
-
12th octubre 2023,
Quote Of the Day
"The Standard You walk Past is the Standard you Set"
Minimum PPE Requirements for INBE Project is:
1) Hard Hat
2) Laced up Safety boots
3) Safety Glasses
4) Gloves
5) Long Shirt and pants ( Orange Shirt Reflector Strips)
Platform 2
RIW,SARC & WET Cards
Busway induction Where Applicable
Subway
RIW Card
There is no Contractor Parking provided on Platform 3 and anyone that is caught Parking in there will be immediately told to leave site
Have a Enjoyable Safe Day
Tiempo en Obra actual
Última actualización el: 9:21 PM
Temperatura: 23C (Aplicación 24C)
Velocidad del viento: 9MPH
Máx. Viento: 20MPH @11:21 AM
Lluvia desde las 9 a.m.: 0.0mm
Temp mín: 20C @5:49 AM
Temp máx: 29C @1:38 PM
Ráfaga: 11MPH
Ráfagas máx: 28MPH @12:21 PM
Lugar de observación - Brisbane, QUEENSLAND
Zona horaria - hora estándar de Australia oriental
Pronóstico - sábado, 4 abril
Shower or two.
Mín: 19C Máx: 29C
Probabilidad de lluvia: 50%
Se esperan precipitaciones: 0 para 1mm
Lugar de la previsión - Brisbane, QUEENSLAND
Zona horaria - hora estándar de Australia oriental
Mañana - domingo, 5 abril
Partly cloudy.
Mín: 18C Máx: 28C
Probabilidad de lluvia: 30%
Se esperan precipitaciones: 0 para 1mm
-
VIC Industry Standard - Safe Erection Structural Steel Buildings May 2009
Subido 9/9/2025
save_alt Descargar -
VIC Industry Standard - Safe Concrete Cutting and Drilling JUN 2017
Subido 9/9/2025
save_alt Descargar -
VIC Industry Standard - Precast and Tiltup Concrete for Buildings APR 2001
Subido 9/9/2025
save_alt Descargar -
VIC Industry Standard - Piling Work and Foundation Engineering Sites JAN 2014
Subido 9/9/2025
save_alt Descargar -
VIC Industry Standard - Electrical Installations on Construction Sites JAN 2011
Subido 9/9/2025
save_alt Descargar -
VIC COP - Managing Exposure Crystalline Silica Engineered Stone NOV 2022
Subido 9/9/2025
save_alt Descargar -
QLD COP - Managing Respirable Crystalline Silica Dust Exposure in Construction and Manufacturing of Construction Elements 2022
Subido 9/9/2025
save_alt Descargar -
QLD COP - How to Manage Control Asbestos in the Workplace FEB 2021
Subido 9/9/2025
save_alt Descargar -
6219 INTREC Site Emergency Management Plan - INBE_REV 7 - Copy - Copy
Subido 10/16/2023
save_alt Descargar -
1.11 Issue Resolution Flow Chart Rev 1 - ADOPT SHOULD BE DISPLAYED ONSITE
Subido 2/7/2022
save_alt Descargar
¿Conoce los requisitos de PPE para esta Obra?
Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.
Empiece a trabajar en cuanto llegue a la obra.
Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.
¿Conoce los requisitos de PPE para esta Obra?
Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.
Empiece a trabajar en cuanto llegue a la obra.
Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.