Cabrini 2 Theatres Project - Openbare Project Locatie
-
19th april 2023, Minimum PPE requirements
PPE - there has become a lack of attention to the minimum PPE requirements on this project.
Minimum PPE across all Intrec sites are
- Hi-Vis
- safety footwear
- long sleeves and long pants
- hard hat
Moving Forward all workers must conform to these minimum site standards if they wish to work on our sites.
Huidige weersomstandigheden op locatie
Laatst bijgewerkt om: 22:21
Windsnelheid: 7KM/U
Max. Wind: 35KM/U @17:21
Regen sinds 9:00 uur: 0,0mm
Windvlaag: 9KM/U
Max. windvlaag: 39KM/U @17:21
Waarneming Locatie - St Kilda Harbour RMYS, VICTORIA
Tijdzone - Oost-Australische standaardtijd
Weerbericht - zaterdag, 4 april
Mostly sunny.
Min.: 11C Max.: 26C
Kans op neerslag: 5%
Weerbericht locatie - Melbourne, VICTORIA
Tijdzone - Oost-Australische standaardtijd
Morgen - zondag, 5 april
Showers.
Min.: 15C Max.: 27C
Kans op neerslag: 80%
Verwachte regen: 0 tot 7mm
-
VIC Industry Standard - Safe Erection Structural Steel Buildings May 2009
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Safe Concrete Cutting and Drilling JUN 2017
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Precast and Tiltup Concrete for Buildings APR 2001
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Piling Work and Foundation Engineering Sites JAN 2014
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Electrical Installations on Construction Sites JAN 2011
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Contaminated Construction Sites JUN 2017
9-9-2025 Geüpload
save_alt Downloaden -
VIC COP - Prevention of Falls in Housing Construction DEC 2019
9-9-2025 Geüpload
save_alt Downloaden -
VIC COP - Prevention of Falls in General Construction DEC 2019
9-9-2025 Geüpload
save_alt Downloaden -
VIC COP - Managing Exposure Crystalline Silica Engineered Stone NOV 2022
9-9-2025 Geüpload
save_alt Downloaden -
QLD COP - Managing the Risks of Plant in the Workplace FEB 2021
9-9-2025 Geüpload
save_alt Downloaden -
QLD COP - Managing Respirable Crystalline Silica Dust Exposure in Construction and Manufacturing of Construction Elements 2022
9-9-2025 Geüpload
save_alt Downloaden -
QLD COP - How to Manage Control Asbestos in the Workplace FEB 2021
9-9-2025 Geüpload
save_alt Downloaden -
NSW COP - Managing the Work Environment and Facilities AUG 2019
9-9-2025 Geüpload
save_alt Downloaden -
1.11 Issue Resolution Flow Chart Rev 1 - ADOPT SHOULD BE DISPLAYED ONSITE
7-2-2022 Geüpload
save_alt Downloaden
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.