140 Elizabeth Street Lobby - Openbare Project Locatie
-
12th november 2024, Site Security
Hi All,
Under no circumstances are you allowed to block the function of any auto doors on site, any breach of this rule will result in the offender being removed from site.
Huidige weersomstandigheden op locatie
Laatst bijgewerkt om: 21:21
Temperatuur: 23C (App 24C)
Windsnelheid: 9KM/U
Max. Wind: 20KM/U @11:21
Regen sinds 9:00 uur: 0,0mm
Min.temp: 20C @05:49
Max.temp: 29C @13:38
Windvlaag: 11KM/U
Max. windvlaag: 28KM/U @12:21
Waarneming Locatie - Brisbane, QUEENSLAND
Tijdzone - Oost-Australische standaardtijd
Weerbericht - zaterdag, 4 april
Shower or two.
Min.: 19C Max.: 29C
Kans op neerslag: 50%
Verwachte regen: 0 tot 1mm
Weerbericht locatie - Brisbane, QUEENSLAND
Tijdzone - Oost-Australische standaardtijd
Morgen - zondag, 5 april
Partly cloudy.
Min.: 18C Max.: 28C
Kans op neerslag: 30%
Verwachte regen: 0 tot 1mm
-
VIC Industry Standard - Safe Erection Structural Steel Buildings May 2009
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Safe Concrete Cutting and Drilling JUN 2017
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Precast and Tiltup Concrete for Buildings APR 2001
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Piling Work and Foundation Engineering Sites JAN 2014
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Electrical Installations on Construction Sites JAN 2011
9-9-2025 Geüpload
save_alt Downloaden -
VIC Industry Standard - Contaminated Construction Sites JUN 2017
9-9-2025 Geüpload
save_alt Downloaden -
VIC COP - Prevention of Falls in Housing Construction DEC 2019
9-9-2025 Geüpload
save_alt Downloaden -
VIC COP - Prevention of Falls in General Construction DEC 2019
9-9-2025 Geüpload
save_alt Downloaden -
VIC COP - Managing Exposure Crystalline Silica Engineered Stone NOV 2022
9-9-2025 Geüpload
save_alt Downloaden -
QLD COP - Managing the Risks of Plant in the Workplace FEB 2021
9-9-2025 Geüpload
save_alt Downloaden -
QLD COP - Managing Respirable Crystalline Silica Dust Exposure in Construction and Manufacturing of Construction Elements 2022
9-9-2025 Geüpload
save_alt Downloaden -
QLD COP - How to Manage Control Asbestos in the Workplace FEB 2021
9-9-2025 Geüpload
save_alt Downloaden -
NSW COP - Managing the Work Environment and Facilities AUG 2019
9-9-2025 Geüpload
save_alt Downloaden -
230825_AMS_FM_X5_00_003_SafetyInDesignRegister_EOT + ON-FLOOR WORKS
12-9-2024 Geüpload
save_alt Downloaden -
INTREC Site Environmental Management Plan LTE -- 2024-07-10 08_40am
12-8-2024 Geüpload
save_alt Downloaden -
1.11 Issue Resolution Flow Chart Rev 1 - ADOPT SHOULD BE DISPLAYED ONSITE
7-2-2022 Geüpload
save_alt Downloaden
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.